banner

Products

Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould

Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould

Overview Product Description Detailed Photos Manufacturing flow of mould Packaging & Shipping Shipping prepareWe will pr
SHARE

Description

Overview
Basic Info.
Application Commodity
Runner Cold Runner
Design Software UG
Installation Fixed
Certification SGS
Standard DME
Customized Customized
Mould Steel P20
Transport Package Polywood Case
Origin Taizhou China
HS Code 8480719090
Product Description

Product Description

Product Name Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould
Model NumberCustomized
Shaping ModelPlastic Injection Mould
Product MaterialSteel
Mould materialP20
Mould life5000,000shots
Mould baseC45
Design softwareUG NX AUTO CAD
Cavity1
Surface treatmentPolishing/ Texture
RunnerHot Runner
Packaging Detailswooden case
PortNingbo
Lead Time60days

Detailed Photos


Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould


Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould

Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould


Manufacturing flow of mould

1RFQGet the sample or drawing from customer, analyze and quote as per customer requests, make DFM, give some professional suggestions to help customer improve the product
2NegotiationDiscuss about the mould steel, delivery time, payment term and so on
3Place an orderCustomer confirms the plastic material, injection machine spec and other details, we start make the design
4Mould designMake the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests.
5Mould toolingStart the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.)
6Mould processingMould process photo or video update to customer each 10 days
7Test sampleT1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve
8DeliveryOnce sample approved, we check eavey detials of mould, make sure the mould work well, than will ship the moulds within 7 days after get customer ship
9ShippingBy Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou

Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould


Packaging & Shipping

Shipping prepareWe will prepare the some wear parts, like spring, ejector pins, cooling conector, eyeblot.pack with the mould1.Check mould component2.Cleaning mould cavity/core and spread slushing oil on the mould3.Cleaning mould surface and spread slushing oil on the mould surface 4.Put into the wooden case5. Transport by container


Disposable Dinnerware PP Plastic Utensil Tableware Cutlery Spoon Knife Fork Mould

Company Profile

Taizhou Tuofang Plastic Mould Co.,Ltd is located in HuangYan Taizhou city which is known as "The Mould City". Tuofang company is specialized in designing and manufacturing Plastic Injection Moulds which is including;Automotive mould: car radiator water tank mould , car fan mould and fan shroud mould, car grille mould, auto lamp mould etc.Commodity Mould: households product mould, kitchenware mould, crate mould, paint bucket mould, garden product mould etc.Home Appliances(electricals) Mould: air cooler mould, washing machine, Fan mould etc.Other Plastic Injection Mould: Motorcycle parts mould, Industrial plastic parts mould

Our Advantages

1. Approved Quality
2. On-Time Delivery
3. Reasonable Price
4.Experienced Staffs
5. Reliable Post-Service
6. Good Reputation
7 .Experienced team for part & mould design
8.Precise dimension control
9.On-titme delivery
10.One year warranty

Our Exhibition

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory
Q:How to go to your factory? You can come to us by flight, bus and bullet train. It's 1.5 hours by flight from Guangzhou to our city. 3 hours by bullet train from Shanghai to our city. 1 hour by bullet train from Ningbo to us
Q: How long is your delivery time?
A: Generally it is 40-60 days for 1st sample. or it is 60-90 days for big mouldsQ: Do you provide samples ? is it free or extra ?
A: Yes, we will send the mould testing smaple to customer, and will part two time freight fee
Q: What is your terms of payment ?
A: 50% T/T in advance ,balance before shippment.
Q: Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 20 minutes from train station to our factory.Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houusQ. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A:Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models

For More Household Product Mould Please Click Here

Our Contact